Construction is only part of the investment
When owners talk about price they usually think of the builder's quote. The real investment has more lines:
- Construction: the builder's contract, including the pool and exterior works.
- Professional fees: architect, technical architect, engineer, health and safety, project manager.
- Studies: topographic survey and geotechnical report.
- Licence: municipal fees and the tax on construction, calculated on the budget of the works.
- Taxes: VAT on construction and fees; stamp duty on the declaration of new building.
- Notary and land registry for the new building.
- Connections: electricity, water, sewerage or treatment system, telecommunications.
- Insurance: construction all-risk and, where required, ten-year insurance.
- Interiors: kitchen, wardrobes, lighting, furniture and landscaping.
What moves the construction cost
- The plot: a steep or rocky plot needs more excavation, retaining walls and structure than a flat one.
- The shape: basements, large spans, cantilevers and big glazed openings cost more than compact volumes.
- The finishes: natural stone, timber windows, bespoke joinery and high-end kitchens can double the cost of the interior.
- The installations: underfloor heating and cooling, home automation, solar panels, pool heating.
- The location: difficult access and remote sites increase transport and labour.
- The moment: prices of materials and availability of trades change from year to year.
How to keep the budget under control
Set a total figure at the start and design to it. Ask for an estimate at each phase of the project, not only at the end. Tender the works on a complete construction project, compare quotes line by line and sign a contract with a closed price. Keep a contingency reserve for the unexpected, and decide changes before they are built, not after. That is exactly what construction management is for.
Frequently asked questions
Why do published prices per square metre vary so much?
Because they compare different things: some include only the structure and basic finishes, others the pool, exteriors, fees and taxes. Always ask what is included.
Is it cheaper to renovate than to build new?
Not necessarily. A full renovation of an old building in poor condition can cost as much per square metre as a new build, although it may allow you to keep a location or a built area that could not be authorised today.
When will I have a reliable figure?
A first range with the preliminary design, a more precise estimate with the basic project and a firm price when builders quote the construction project.