Fees are freely agreed
Professional associations cannot set mandatory fee scales, so each studio makes its own proposal. Most calculate fees as a percentage of the estimated construction cost or as a fixed amount based on the size and complexity of the project. Both methods are valid; what matters is the scope.
What a full commission includes
- Feasibility study and preliminary design.
- Basic project for the licence.
- Construction project: structure, installations, details, measurements and budget.
- Site supervision and completion certificate.
Check whether the proposal also includes the structural and installation engineering, 3D images, the interior design, the landscape project, the licence procedure and the paperwork at the end of the works.
Other professionals required by law
In addition to the architect, a building project needs a technical architect to direct the execution of the works, a health and safety coordinator, a geotechnical study and usually a topographic survey. Their fees are separate unless the studio offers them together.
How to compare proposals
Compare the same scope, the number of site visits, who will actually do the work, how changes are charged and the payment schedule, which is normally linked to phases. The cheapest proposal is rarely the one that costs least in the end: an incomplete project is paid for during the works, in extras and delays.
Frequently asked questions
When are the fees paid?
By phases: usually a part on commissioning, on delivery of the basic project, on delivery of the construction project and during the works.
Is VAT added to the fees?
Yes, professional fees are subject to VAT at the general rate.
What is the visado?
It is the registration of the project with the architects' association, which verifies the identity and qualification of the author and the formal completeness of the documents. It has a cost that is paid separately.