Skip to content
Contact
  1. Home
  2. Guides
  3. Certificate of occupancy in Mallorca

Guide

Certificate of occupancy in Mallorca (cédula de habitabilidad)

The cédula de habitabilidad certifies that a dwelling meets the minimum conditions to be lived in. You will be asked for it to contract utilities and, often, to sell or rent.

What it is and who issues it

In the Balearic Islands the certificate of occupancy is issued by the island council — in Mallorca, the Consell de Mallorca. It states the address, the built area, the rooms and the maximum number of occupants of the dwelling.

When you need it

  • To contract or change the holder of water, electricity and gas supplies.
  • When selling or renting, as buyers, tenants and banks normally ask for it.
  • At the end of a new build or of a renovation that changes the dwelling substantially.

New buildings: the documents at the end of the works

After a new build the sequence is: completion certificate signed by the architect and the technical architect; first occupation licence from the town hall, which confirms that what was built matches the licence; and the first occupation cédula from the island council. With them you can sign the declaration of completed works before a notary and register the house.

Existing dwellings

For existing dwellings the cédula is renewed or obtained on the basis of a certificate issued by an architect or technical architect after inspecting the property. It has a limited period of validity, after which it must be renewed. If the dwelling has unlicensed extensions, the certificate can only cover what is legal, which is one more reason to regularise the property; see legalisation.

Frequently asked questions

Can I sell a house without a cédula?

It is legally possible if the buyer agrees, but it complicates the sale, the mortgage and the utilities. It is better to obtain it beforehand.

Does the cédula prove that the house is legal?

No. It certifies habitability, not compliance with planning law. A house can have a cédula and still have unlicensed works.

How long does it take to obtain?

For an existing dwelling in order, the technical inspection is quick and the time depends on the island council. For a new build it follows the first occupation licence.

Contact

Tell us about your project

Describe the plot, the house or the idea and we will come back to you with a first assessment: what can be done, which permits it needs and how we would organise it.

  • First consultation free of charge and without obligation
  • A reply from an architect, not from a call centre
  • Projects in Mallorca, Ibiza, Menorca and Formentera